Read the April 2012 issue here
Read the April 2012 Supplement here
Articles about this company:
Ready to go on new engine regulations (1st April 2012)
Volkswagen engines are ahead of the curve when it comes to complying with the new Tier 4 Final/Stage IIIB requirements argues Robert Marshall, managing director, Marshalls Industrial. The new requirements come into force in
From Facilities Management
Modular dock an option (1st March 2012)
A modular dock can be used to convert a building without loading bays to allow it to be used for distribution, says Chase Equipment
Premier modular docking (1st October 2007)
Although concrete docks were originally chosen to convert the selected 2,000m2 site of Whitbread's Premier Travel Inn distribution centre, Chase Equipment's Modular Docking System proved a more flexible solution. Cha
Highly flexible modular docking (23rd April 2007)
Chase Equipment's Modular Docking System is providing a flexible solution at Whitbread's Premier Travel Inn 2000m2 distribution centre...
From Newsletter Stories
Highly flexible modular docking (1st April 2007)
Chase Equipment's Modular Docking System is providing a flexible solution at Whitbread's Premier Travel Inn 2000m2 distribution centre. Working together with architects and the client to very short timescales, Chase converted
From Products
Loading flexibility (1st February 2007)
If you are facing a particular challenge in the loading bay area, the chances are chase Equipment will be able to supply a specialist solution. Charlotte Stonestreet reports In these days of cheap materials handling equipmen