Less steel, more support
December 1st 2007

Crawford UK has supplied doors and docking systems optimised for high frequency usage to the UK's largest speculative DC, the 750,000ft2 Nimbus Park.

The Crawford 542 Overhead Sectional Logistics Door, in contrast to other vertical lift doors on the market, has self supporting tracks. This means that they only need the steelwork to extend one metre above the door height.

As a result, savings can be made in terms of the additional steelwork required, particularly in multi-bay applications.

Its counterbalance springs fitted at low level and fixed directly to the tracks drastically reduced the amount of steelwork required to install the door.

At Nimbus Park, in conjunction with the use of Bullivants Prowall system the door structural frame was omitted completely.

In total some 75 SME Dock Shelters and Dock Levellers, incorporating a 500 long swing lip and combination control panel were installed along with 75 Logistics doors.

Should any problems arise, building end users have access to a single contact number for 24 hour support.