Register | Login | Set as Home Page | Bookmark | General Enquiries | Help | Monday, 01st of December 2008
HSS Logo
hsssearch.com
Search 
Magazine 
Register for our ENewsletter
Click to visit sponsors web site
Click to visit sponsors web site

Click to visit http://www.windsorkomatsu.co.uk

HSDGuide.com

Premier modular docking
October 1st 2007

Although concrete docks were originally chosen to convert the selected 2,000m2 site of Whitbread's Premier Travel Inn distribution centre, Chase Equipment's Modular Docking System proved a more flexible solution. Chase converted the ground level manufacturing site to a distribution centre able to accommodate a number of 40t trucks simultaneously, with the ability to decant into small, multi-drop local vehicles quickly and safely. The bespoke system allows for modifications and additions over time if plans change, with minimum permanent disruption to the building. Two weeks after moving in, a fire in the adjacent timber depot and subsequent damage to Whitbread's own premises, meant that immediate temporary relocation was necessary. The loading docks, levellers, bridging plates and associated equipment, all unaffected by the fire, were moved locally by Chase and the customer was up and running at full capacity again within days. "Chase Equpiment's ability to relocate equipment was tested almost immediately due to the fire damage, but the company was able to service our requirements straight away," says Steve Guy from Whitbread.

More articles from Chase Equipment Limited: