Preventative maintenance regime February 1st 2008 To avoid a breakdown in the
loading bay, Stertil Stokvis
says it can provide a
proactive and well-planned
maintenance regime,
designed specifically around
a company's operations. A
regime like this can also
keep businesses abreast of
the latest regulations and
health and safety
requirements.
It's no good if a supplier
can respond quickly but,
once on site, is unable to
carry out the necessary
repairs. All Stertil Stokvis
engineers carry an extensive
range of parts with them at
all times. If an operation is
busy at set times of the day,
Stertil Stokvis will work
outside of these hours,
ensuring minimum
disruption to work. With
strict compliance procedures
in place, Stertil Stokvis is
externally audited by
SafeContractor, an industryrecognised
body.
For advice or to arrange a
free, no-obligation site visit
from a technical
representative, call the
number below. More articles from Stertil UK Ltd: |