New loading bays supplied by Stertil December 1st 2006 Stertil Stokvis has completed a distribution centre installation for Multipart Supply Chain Solutions at its 268,000ft2 Chorley site, that will allow around 25 deliveries and 10 despatches to be made per day. Stertil products used at the site include a swinglip dock leveller, wheel guide, collapsible dock shelter and a Thermadoor insulated sectional overhead door for each loading bay, as well as two level access doors, eight fire exit doors and three RapidRoll 660 doors inside the building. Stertil worked alongside Bowmer and Kirkland, the main building contractors, to complete the installation. More articles from Stertil UK Ltd: |