Shower protection for showers December 1st 2005 Nuneaton-based shower manufacturer, Triton, has installed a CopriSystems canopy to protect its loading operation. Importing parts from as far afield as China, Triton needed additional environmental protection to reduce wet damage while unloading. There was also a need for temporary storage.
The CopriSystems canopy measures 15m wide by 6.5m long and is rear wall mounted to the factory. The front of the canopy has been left open without sliding curtain doors to allow free access at all times. It is in a sheltered location, so wind is not a problem
Uneven levels on site, however, meant that additional concrete ground work had to be built to ensure the canopy stood square to the building.
Installation of the canopy took just a few days, ensuring minimum disruption to site.
"We chose CopriSystems because its product is first class and a reasonable price.
We no longer have any wet damage problems and the unloading operation runs smoothly," said Mick Phelps, maintenance manager at the site. More articles from CopriSystems Ltd: |