Register | Login | Set as Home Page | Bookmark | General Enquiries | Help | Friday, 10th of February 2012
HSS Logo
hsssearch.com
Search 
Magazine 
Register for our ENewsletter
Click to visit http://www.toyota-forklifts.co.uk/EN/resources/Pages/default.aspx

Coming up in H&SS February: Counterbalance Trucks; Heavy Duty Lifting & Moving; The Cold Store; Warehouse Flooring; Pallets & Pallet Handling; Bespoke Structures

What next?
 Request further Information    visit web site     Send to friend
 Spaciotempo UK Ltd company's profile
Click to visit http://www.windsorkomatsu.co.uk

HSDGuide.com

Space needn't cost a packet
October 1st 2009

Spaciotempo says two recent projects – at a packaging firm and a crisp manufacturer – show just how versatile temporary buildings can be

Spaciotempo was approached by corrugated packaging giant Smurfit Kappa UK's northern regional director, Andy Burrows, to propose a solution for an external temporary structure. His key requirement was for a sufficiently large building that would not only provide storage but also protection of the company's paper based products from the effects of the weather.

From the initial enquiry in Spaciotempo supplied and installed a 1600m2 temporary warehouse on site in within two months, fully assisting the company with the specification, drawings and planning permission for the temporary structure. A combination of anodised aluminium frame, high quality UPVC wall panels and thermo roof has ensured that the stock has remained fully protected from the elements. Roller shutter doors enables ease of access for the company's fork lift trucks, while two personnel doors ensure that the company is fully compliant with health and safety requirements for pedestrians.

"I'm extremely pleased with the service from Spaciotempo," says Burrows. "As a result, I've recommended the company across the group for future temporary storage needs." Some weeks later, another firm approached Spaciotempo. But this time, the order was much closer to home: Uttoxeterbased crisp manufacturer, glennans, which is located directly opposite Spaciotempo on the Dovefields Industrial Estate.

The firm was therefore naturally able to respond quickly to its requirement for a 10m x 20m aluminium framed structure.

The building, which has been hired for an initial period of two years, was installed on-site, adjacent to the existing factory - directly onto a hard standing surface. Two roller shutter doors were specified for fork lift use with an additional personnel door located to one side for the safe passage of staff.

Manufactured to BS standards, the building has snow and wind loadings equivalent to permanent structures and features a durable pvc coated polyester roof, which allows a full eaves height of 5m, complementing ceiling height racking and shelving systems.