New drivethrough operation August 1st 2008
Palletline has announced
plans to invest £20m in
new central hub premises
based in Solihull. The
operational systems
planned will create the
systems and capacity to
process over 25,000
pallets per 24 hour
window.
Palletline claims its new
hub will be the industry's
first drive-through, sideload
operation, achieving
total depedestrianisation.
An on-site quality
control centre will consist
of vehicle scanning lanes
capable of processing 80
vehicles an hour and an
undercover area for load
checking. The system
separates quality control
from sortation activities
and allows rigorous
freight checking
procedures to achieve
total traceability. More articles from Palletline Plc: |