Register | Login | Set as Home Page | Bookmark | General Enquiries | Help | Friday, 25th of May 2012
HSS Logo
hsssearch.com
Search 
Magazine 
Register for our ENewsletter


Coming up in HSS June: Specialist Trucks (inc telehandlers, sideloaders, heavy duty trucks & container handlers); Pallet Networks; Transit Packaging (inc pallets, shrinkwrap, containers, temp controlled, strapping, weighing & dimension analysis); Value Added Logistics. Supplement: The Warehouse

What next?
 Request further Information    visit web site     Send to friend
 Enersys Ltd company's profile
Click to visit http://www.windsorkomatsu.co.uk

Click to visit sponsors web site

HSDGuide.com

Topping up is taken down
August 1st 2008

The new Hawker Water Less motive power batteries from EnerSys allow extended periods between topping up – between 4 and 13 weeks.

The company says this produces a reduction in battery maintenance labour of between 60% and 75%.

Providing a high level of power for all industrial traction applications, the Water Less uses PzS technology and advanced components. The battery has a reduced prism height and new flip top plugs. It possesses a larger electrolyte capacity and has an electrolyte level indicator fitted as standard to inform the user when topping up with water is necessary.

Hawker Water Less batteries are suitable for all applications and can be recharged with both 50 Hz and HF chargers. A period between topping up of 4 weeks is achievable when used with 50 Hz chargers.

If charged with Hawker HF technology, topping up is approximately 8 weeks.

Additional savings are made with reduced electricity costs and less water. When used in conjunction with Hawker HF chargers and electrolyte circulation technology, a 13 week period between topping is achievable.

More articles from Enersys Ltd: