Register | Login | Set as Home Page | Bookmark | General Enquiries | Help | Saturday, 04th of July 2009
HSS Logo
hsssearch.com
Search 
Magazine 
Register for our ENewsletter
What next?
 Request further Information         Send to friend
 Enersys Ltd company's profile
Click to visit http://www.theenergyevent.com/

Click to visit http://www.windsorkomatsu.co.uk

Click to visit http://www.healthandsafetyevents.co.uk/

HSDGuide.com

Trifik efficiencies from Linde trucks
June 1st 2005

A Linde customer of 30 years is continuing to benefit from the relationship between the two companies.

Lignacite manufactures concrete masonry products at its site in Nazeing, Essex. Due to increasingly high production volumes, free space to store stock on site was becoming an issue. Following an extensive site survey by Hoddesdonbased Linde Trifik, it was clear that the best way to optimise storage was to stack the concrete block packs seven high rather than six. Linde Trifik also introduced double overhead block clamps – meaning Lignacite could move packs of blocks twice as fast.

To handle the heavy loads stacking capability when fitted with the double block clamp. The remaining H 70 has a standard lift and conventional forks for operation inside the Lignacite manufacturing area and is also fitted with an Eberspaecher particulate filter to protect the working environment.

“While we deal with over 100 suppliers for various products and services, I can confirm that Linde is second to none,” says Lignacite operations director, Allan Eastwood.

and intensive working conditions, Linde Trifik also supplied six H 70 engine powered, seven tonne capacity counterbalance trucks. The masts of five of the trucks were customised to provide the seven high

More articles from Enersys Ltd: