Warehousing solution December 1st 2009 A warehousing solution from SDI
Group is reported to have increased
capacity at GSI Commerce's Oldham
distribution centre by 30%.
The project has involved the
installation of a two-tier mezzanine
extension in an existing single-tier
structure that provides a further
4100m2 of space.
GSI Commerce, an e-commerce
and multichannel solutions provider,
needed to expand its warehousing
capability to handle recent business
growth. The mezzanine structure
will be used to store items either on
pallets or within shelving that has
been designed to maximise the
available floor space. The solution
incorporates an inbound and
outbound conveyor system to
transport cartons and totes between
all three floors, whilst wired pallet
gates will enable the movement of
pallets between each level. More articles from SDI Group Limited: |