Protecting loading bays from icy blasts December 1st 2007 Aria Technology in
Manchester is using two
canopies from CopriSystem
to protect IT products from
the strong
Northern wind
when loading and
unloading.
The two canopy
buildings, rear wall
mounted over the
goods in and
goods out doors,
provide both
environmental
protection for staff
and reduce debris
inside the warehouse itself.
Being enclosed and covered,
the loading process is also
more secure.
The two canopies
measure 6.5m wide and 7m
long and 4.3m high. The
vans reverse into the
building so loading and
unloading can take place.
"We chose the
CopriSystems building
because of its functional
benefits and because it was
the most cost effective
solution to our problem,"
says warehouse manager,
Steven Fitch. Call the
number below for details. More articles from CopriSystems Ltd: |