Register | Login | Set as Home Page | Bookmark | General Enquiries | Help | Friday, 12th of March 2010
HSS Logo
hsssearch.com
Search 
Magazine 
Register for our ENewsletter
Click to visit sponsors web site

COMING UP IN HSS... MARCH: Safer Manual Handling, Conveying & Sortation, Picking, Pallets & Pallet Networks, Forklifts, Attachments & Ancillaries Supplement - APRIL: Space Sweating (warehouse optimisation), Logistics Link Live Preview, Facilities Focus (incl HVAC, lighting, energy saving solutions, flooring & floorcare), Packaging & Transit Packaging (incl Total Processing & Packaging)

What next?
 Request further Information    visit web site     Send to friend
 Spaciotempo UK Ltd company's profile
Click to visit http://www.doosanscrappage.com

Click to visit sponsors web site

Click to visit http://www.windsorkomatsu.co.uk

HSDGuide.com

Chilled storage
June 1st 2007

When French based 3A Group decided to bring its storage facilities in-house, it turned to Spaciotempo.

The chilled storage specialists proposed a building made of two layers, built onto a concrete slab and with a high level of foam and drip edge compression sealing to create an airtight unit. The external layer consisted of a standard aluminium framed structure covered with single layer steel clad wall panels and a PVC roof system. Inside this, a hermetic internal chamber was assembled engineered from insulated sandwich panel side walls and a suspended ceiling.

As well as eliminating any impact from the sun's rays, the external layer also created an air space offering the possibility of a ventilation system between the two layers.

More articles from Spaciotempo UK Ltd:

TempAstor becomes Spaciotempo (14th November 2006)

From Newsletter Stories